Back to Top

E & H RESTORATION

Since 1978

Concrete Restoration

ROCK ISLAND ARSENAL BUILDING 220

In 2005 we were awarded the contract to perform the concrete restoration on Building 220 at the Rock Island Arsenal.


We removed deteriorated concrete using the pneumatic chipping hammers, saw cut all edges of patches, abrasive blasted on steel and concrete to remove corrosion from steel and open the pores of the concrete.  We applied a corrosion inhibitor to all reinforcing steel. We then applied patch material that has integrated corrosion inhibitors as part of the patch material to stop future corrosion. We increased cover over the existing reinforcing where the building esthetics would not be affected. Finally we applied two coats of an anti-carbonation elastomeric paint.


19026 RIA Bldg 211

E&H Restoration was hired because the upper building walls were showing signs of wide spread deterioration. The exterior concrete was spalling due to corrosion of the mild steel reinforcing. We completed structural concrete repairs to the building and decorative concrete elements.



Project Title

Info on project here.



Small photogallery here


Small photogallery here

Project Title

Info on project here.